Please use this identifier to cite or link to this item:
http://hdl.handle.net/20.500.14121/1146
Title: | Bharatiya Mazdoor Sangh: Ek Abhilekh [भारतीय मज़दूर संघ: एक अभिलेख] |
Authors: | Sharma, Dr. Siyaram |
Keywords: | BMS Siyaram Sharma Progress Data of BMS Growth of BMS All India Conference Indian Labor Union Movement Rail Strike of 1974 |
Publisher: | ILHRP, V.V. Giri National Labour Institute, NOIDA |
Abstract: | Study Report based on Bharatiya Mazdoor Sangh (BMS) written by Dr. Siyaram Sharma submitted to ILHRP, V.V. Giri National Labour Institute, NOIDA. |
URI: | http://hdl.handle.net/20.500.14121/1146 |
Appears in Collections: | Study Report |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
Bharatiya Mazdoor Sangh: Ek Abhilekh.pdf | 2.05 MB | Adobe PDF | Preview PDFDownload |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.